Entrance Ramp I-27 over Shared use path

I-278 WB Exit 48 Ramp · County 005, New York · Built 2022 · 1 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000106666I
Year Built
2022
Length
103.6 m (339.9 ft)
Max Span
51.5 m
Width
8.5 m (27.9 ft)
Lanes
1
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,012,000
Total Project Cost
$7,948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.