RTE 17 over RAMAPO RIVER
3.1 MI S JCT RTS 32 & 208 · County 071, New York · Built 1993 · 3 Lanes · 11,637 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.3102, -74.142872
This bridge is in worse condition than 32.8% of bridges in County 071. The average bridge in New York is 0 years old; this one is 33 years old.
Nearby Bridges
RIVER ROAD over RAMAPO RIVER
Built 1985
RTE 6 over 17 17 83011252 RTE 17
Built 1994
RTE 6 over 17 17 83101259 RTE 17
Built 1994
RTE 32 over 984C 984C83011000 984C9
Built 2019
RTE 32 over 984C 984C83011000 984C
Built 2019
RTE 32 over Nininger Road
Built 2019
ARDEN HOUSE RD over 87IX 87IX 87IX RTE I8
Built 1958
RTE 6 over 87IX RTE I87 RAMAPO RI
Built 1968
EX16 RMP TO I87SB over MNCRR
Built 2004
87IX EXIT 16 RAMP over METRO NORTH RR
Built 1953
Bridge Details
- Structure #
- 000000001014020
- Year Built
- 1993
- Length
- 23.8 m (78.1 ft)
- Max Span
- 22.8 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 3
- Daily Traffic
- 11,637
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,233,000
- Total Project Cost
- $1,954,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.