RTE 32 over 984C 984C83011000 984C9

0.15 MI E NY 17EB Exit 13 · County 071, New York · Built 2019 · 3 Lanes · 8,936 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000001003342
Year Built
2019
Length
46.9 m (153.9 ft)
Max Span
23.2 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
8,936
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,803,000
Total Project Cost
$6,031,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.