C-CENTRAL ROAD over FENCED UP HORSE ARROYO

2.9 KM NW OF BRIDGE 00143 · County 031, New Mexico · Built 1943 · 2 Lanes · 5 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
5
Fair
Substructure
2
Critical

Bridge Details

Structure #
DAPATEWIN000427
Year Built
1943
Length
18.5 m (60.7 ft)
Max Span
6.2 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
5
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.