FDR 156 over GALLINAS RIVER
.31 MI E/O E.V. LONG CG · County 047, New Mexico · Built 1966 · 1 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.698364, -105.416172
This bridge is in worse condition than 28.6% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
NM-65 over Beaver Creek
Built 2001
NM-65 over UNNAMED WATERWAY
Built 1986
FDR 263 over GALLINAS RIVER
Built 1958
FDR 263 over GALLINAS RIVER
Built 1958
FDR 263 over GALLINAS RIVER
Built 1965
NM-283 over TECOLOTE CREEK
Built 1977
47-A19A over TECOLOTE CREEK
Built 1980
NM-65 over HILL SIDE
Built 1990
47-A19A over TECOLOTE CREEK
Built 1974
NM-283 over UNNAMED WATERWAY
Built 1979
Bridge Details
- Structure #
- 031005000001512
- Year Built
- 1966
- Length
- 13.7 m (44.9 ft)
- Max Span
- 8.2 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 1
- Daily Traffic
- 150
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.