FSR 94 over TULAROSA RIVER
.1 MI S. APACHE CREEK NM · County 003, New Mexico · Built 1987 · 1 Lanes · 399 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.832803, -108.622514
This bridge is in worse condition than 60% of bridges in County 003. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
Bridge Details
- Structure #
- 030606000001028
- Year Built
- 1987
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.6 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 399
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $560,000
- Total Project Cost
- $600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.