FS Road 478 over RIO CHIQUITO
0.15 mi E/O JCT FSR 437 · County 055, New Mexico · Built 2021 · 1 Lanes · 20 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
36.312772, -105.425231
This bridge is in worse condition than 50.5% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 5 years old.
Nearby Bridges
55-C082 over RIO GRANDE DE RANCHOS
Built 1984
CAMINO DE LA CRUZ over PASEO DEL CANON E DRAIN
Built 2003
NM-518 over RIO CHIQUITO
Built 1934
CAMINO DE COLORES over PASEO DE CANON E DRAIN
Built 2009
55-A083 over RIO FERNANDO DE TAOS
Built 1984
TAOS MID SCHOOL RD over PASEO DEL CANON E DRAIN
Built 2003
Bridge Details
- Structure #
- 030204000035725
- Year Built
- 2021
- Length
- 9.1 m (29.9 ft)
- Max Span
- 7.3 m
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.