BIA-37 over WASH
15KM NE OF TWIN LAKES · County 031, New Mexico · Built 1953 · 1 Lanes · 24 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.777219, -108.69945
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 73 years old.
Nearby Bridges
31-MC37 over FIGUREDO WASH
Built 1993
IRR BIA RTE N9 over COYOTE WASH
Built 1970
IRR/US-491 over Figuerado Wash
Built 2017
US-491 SBL over Figuerado Wash
Built 2017
IRR BIA RTE N9 over DITCH DRAINAGE
Built 2002
IRR BIA RTE N9 over DITCH DRAINAGE
Built 2000
BIA ROUTE N9 over COYOTE CANYON WASH
Built 2002
IRR/US-491 over UNNAMED WATERWAY
Built 2018
US-491 over BLACK CREEK
Built 1999
US-491 over UNNAMED WATERWAY
Built 1999
Bridge Details
- Structure #
- 0000N36780T0694
- Year Built
- 1953
- Length
- 29 m (95.1 ft)
- Max Span
- 6.1 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 24
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.