NM-528 over ARROYO DE LA BARRANCA
1.0 MI N OF NM-448 · County 043, New Mexico · Built 1993 · 3 Lanes · 23,460 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.286236, -106.605906
This bridge is in worse condition than 48.3% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 33 years old.
Nearby Bridges
NM-448 over CORRALES MAIN CANAL
Built 1992
NM-448 over SANDOVAL LATERAL
Built 1992
NM-448 over Harvey C Jones Channel
Built 1987
NM-528 over ARROYO VENADA
Built 1993
NM-528 over ARROYO DELOS MONTOYAS
Built 1977
NM-347 over Future Roadway
Built 2014
I-25 NBL and SBL over Sandia wash
Built 2011
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1954
43-4301 over NM-347
Built 2014
43-4301 over NM-347
Built 2014
Bridge Details
- Structure #
- 000000000010074
- Year Built
- 1993
- Length
- 9.4 m (30.8 ft)
- Max Span
- 4.3 m
- Lanes
- 3
- Daily Traffic
- 23,460
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.