NM-556 over South Pino Arroyo
1.9 MI N OF MONTGOMERY · County 001, New Mexico · Built 1992 · 4 Lanes · 11,079 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.158611, -106.497053
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 34 years old.
Nearby Bridges
Quaking Aspen over South Pino Arroyo
Built 2003
Canada Del Oso over Unnamed Arroyo
Built 1995
Apache Plume over Unnamed Arroyo
Built 1995
NM-556 over South Domingo Baca
Built 1992
NM-556 over N DOMINGO BACA ARROYO
Built 1994
Tramway Lane NE over N Domingo Baca Arroyo
Built 1999
FL-5073 over TRAMWAY DIVERSION CHANNL
Built 1992
FL-6616 over Unnamed Waterway
Built 1997
NM-423 over Tennyson Street NE
Built 1990
NM-556 over Bear Canyon Arroyo
Built 1992
Bridge Details
- Structure #
- 000000000010048
- Year Built
- 1992
- Length
- 19.4 m (63.6 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 11,079
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $689,000
- Total Project Cost
- $1,034,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.