IRR BIA RTE N3002 over GALLEGOS WASH
3.5 MI E OF CHACO PLANT · County 045, New Mexico · Built 1984 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
36.496611, -108.062725
This bridge is in worse condition than 56.9% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 42 years old.
Nearby Bridges
IRR BIA RTE N4030 over DRAINAGE DITCH
Built 1975
45-7150 over GALLEGOS WASH
Built 2015
IRR BIA RTE N4022 over COURY LATERAL CANAL
Built 1980
IRR BIA RTE N4028 over COURY LATERAL CANAL
Built 1980
IRR BIA RTE N4022 over DRAINAGE DITCH
Built 1975
IRR BIA RTE N4022 over MAIN CANAL
Built 1975
IRR BIA RTE 4178 over DRAINAGE CANAL
Built 1980
IRR BIA RTE N3003 over DRAINAGE DITCH
Built 1975
IRR BIA RTE N3003 over MAIN CANAL
Built 1975
IRR BIA RTE 4178 over IRRIGATION CANAL
Built 1992
Bridge Details
- Structure #
- 00000000000N818
- Year Built
- 1984
- Length
- 46 m (150.9 ft)
- Max Span
- 18.4 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.