IRR BIA RTE N9 over PEACH SPRINGS WASH
2.3 MI EAST COYOTE CANYON · County 031, New Mexico · Built 1970 · 2 Lanes · 1,135 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.789111, -108.510731
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Bridge Details
- Structure #
- 00000000000N685
- Year Built
- 1970
- Reconstructed
- 1996
- Length
- 10.1 m (33.1 ft)
- Max Span
- 1.8 m
- Width
- 33.3 m (109.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,135
- Material
- Steel
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.