IRR BIA RTE N321 over CRYSTAL CREEK

IN CRYSTAL NEW MEXICO · County 045, New Mexico · Built 1940 · 2 Lanes · 254 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
2
Critical
Substructure
2
Critical

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 2 Critical
Substructure 2 Critical

Location

35.038106, -108.988058

This bridge is in worse condition than 98.9% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 86 years old.

Nearby Bridges

Bridge Details

Structure #
00000000000N616
Year Built
1940
Length
26.2 m (86 ft)
Max Span
6.5 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
254
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$425,000
Total Project Cost
$550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.