IRR BIA RTE N321 over CRYSTAL CREEK
IN CRYSTAL NEW MEXICO · County 045, New Mexico · Built 1940 · 2 Lanes · 254 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
2
Critical
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 2 | Critical |
| Substructure | 2 | Critical |
Location
35.038106, -108.988058
This bridge is in worse condition than 98.9% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 86 years old.
Bridge Details
- Structure #
- 00000000000N616
- Year Built
- 1940
- Length
- 26.2 m (86 ft)
- Max Span
- 6.5 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 254
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $425,000
- Total Project Cost
- $550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.