IRR BIA RTE N36 over CHACO RIVER

11MI WEST OF FRUITLAND NM · County 045, New Mexico · Built 1990 · 2 Lanes · 1,711 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00000000000N245
Year Built
1990
Length
114.2 m (374.7 ft)
Max Span
37.9 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
1,711
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.