IRR BIA RTE 39 over NAVAJO RIVER

6.6 KM NW OF DULCE NM · County 039, New Mexico · Built 1973 · 1 Lanes · 30 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
00000000000M302
Year Built
1973
Length
19.3 m (63.3 ft)
Max Span
17.8 m
Width
3.6 m (11.8 ft)
Lanes
1
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.