IRR BIA RTE 85 over RIO GRANDE RIVER
IN SAN FELIPE PUEBL0 · County 043, New Mexico · Built 1972 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.440033, -106.442983
This bridge is in worse condition than 85% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 54 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1960
IG-2252 over Tonque Arroyo
Built 1983
I-25 SBL over San Felipe Pueblo X-Rd
Built 1984
I-25 NBL over San Felipe Pueblo X-Rd
Built 1984
I-25 SBL over Tonque Arroyo
Built 1984
I-25 NBL over Tonque Arroyo
Built 1984
FR-2084 over I-25 NBL and SBL
Built 1984
IN-2252 over Tonque Arroyo
Built 1983
I-25 NBL/SBL over N BRANCH MARIA CHAVEZ AR
Built 1955
IRR/I-25 SBL over Arroyo De Los Tanos
Built 1983
Bridge Details
- Structure #
- 00000000000M101
- Year Built
- 1972
- Length
- 122.5 m (401.9 ft)
- Max Span
- 24.5 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.