I-40 WBL over Edith Blvd.

Junction I-25 and I-40 · County 001, New Mexico · Built 2003 · 5 Lanes · 136,306 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000009919
Year Built
2003
Length
27.3 m (89.6 ft)
Max Span
27.3 m
Width
36.6 m (120.1 ft)
Lanes
5
Daily Traffic
136,306
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.