NM-15 over WEST FORK GILA RIVER
3.4 MI NW OF GRANT CL · County 003, New Mexico · Built 2016 · 2 Lanes · 226 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.226014, -108.251281
This bridge is in worse condition than 60% of bridges in County 003. The average bridge in New Mexico is 0 years old; this one is 10 years old.
Bridge Details
- Structure #
- 000000000009717
- Year Built
- 2016
- Length
- 61 m (200.1 ft)
- Max Span
- 20.1 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 226
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.