NM-90 over SAN VICENTE ARROYO/ROAD
41.4 MI E OF JCT US-70 · County 017, New Mexico · Built 2016 · 4 Lanes · 8,412 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.765383, -108.275086
This bridge is in worse condition than 61.6% of bridges in County 017. The average bridge in New Mexico is 0 years old; this one is 10 years old.
Nearby Bridges
FL-4844 over SAN VICENTE ARROYO
Built 1972
FL-4843 over SAN VICENTE CREEK
Built 1964
NM-90 over PINOS ALTOS CREEK
Built 1961
17-Z000 over SILVA CREEK
Built 1948
FL-5850 over PINOS ALTOS CREEK
Built 1953
FL-5835 over PINOS ALTO CREEK
Built 1977
US-180 over SILVER CREEK
Built 1963
US-180 over MISSISSIPPI STREET
Built 1963
US-180 over PINOS ALTOS CREEK
Built 1948
17-Z000 over SAN VICENTE ARROYO
Built 1988
Bridge Details
- Structure #
- 000000000009658
- Year Built
- 2016
- Length
- 167.3 m (548.9 ft)
- Max Span
- 35.9 m
- Width
- 19.7 m (64.6 ft)
- Lanes
- 4
- Daily Traffic
- 8,412
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.