NM-314 over Belen Irrigation Canal
6 M N Jct NM-6/NM-312 · County 001, New Mexico · Built 2014 · 2 Lanes · 5,513 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.891594, -106.711181
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 12 years old.
Nearby Bridges
NM-314 over BNSF RR (one track)
Built 2010
IRR/I-25 NBL over BNSF Railroad
Built 1970
IRR/I-25 SBL over BNSF Railroad
Built 1970
NM-317 over I-25 NBLS/SBLS-Isleta
Built 1971
IRR/I-25 NBL/SBL over Ranch road
Built 1971
IRR/NM-147 over RIO GRANDE
Built 1975
NM-314 SBL over LOOP 001-3/BELEN
Built 1970
North Bosque Loop over Irrigation Canal
Built 1937
IRR BIA RTE 62 over CHICAL LATERAL
Built 2001
I-25 NBL/SBL over RANCH ROAD
Built 1971
Bridge Details
- Structure #
- 000000000009629
- Year Built
- 2014
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.5 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 5,513
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.