I-25 NBL over NM-556 (Tramway Blvd)
8.1 M N Jct I-25/I-40 · County 001, New Mexico · Built 2006 · 3 Lanes · 70,020 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
35.20405, -106.576903
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 20 years old.
Nearby Bridges
I-25 SBL over NM-556 (Tramway Blvd)
Built 2006
Fl-4053 over La Cueva Arroyo
Built 2003
I-25 NBL/SBL over LA CUEVA ARROYO
Built 1985
Fl-4057 over La Cueva Arroyo
Built 2003
NM-556 over Edith Blvd
Built 2016
San Mateo Blvd. over La Cueva Arroyo
Built 1984
NM-566 over NMRX RAILROAD
Built 2016
FL-5098 over North Diversion Channel
Built 1967
San Diego Avenue over North La Cueva Arroyo
Built 1986
I-25 NBL over NM-528. (Alameda Avenue)
Built 1985
Bridge Details
- Structure #
- 000000000009342
- Year Built
- 2006
- Length
- 53.6 m (175.9 ft)
- Max Span
- 25.9 m
- Width
- 19.5 m (64 ft)
- Lanes
- 3
- Daily Traffic
- 70,020
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.