I-25 SBL over NM-320
Dona Ana Interchange · County 013, New Mexico · Built 2007 · 2 Lanes · 7,679 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.390156, -106.808147
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 19 years old.
Nearby Bridges
I-25 NBL over NM-320
Built 2007
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1961
NM-320 over IRRIGATION CANAL
Built 1923
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1966
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1960
13-D039 over LEASBURG CANAL
Built 1974
13-D017 over LEASBURG CANAL
Built 1940
NM-185 over IRRIGATION CANAL
Built 1933
I-25 NBL and SBL over Engler Road
Built 2013
13-D018 over LEASBURG CANAL
Built 1941
Bridge Details
- Structure #
- 000000000009336
- Year Built
- 2007
- Length
- 34.4 m (112.9 ft)
- Max Span
- 34.1 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 7,679
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.