01-Z000 over Amole Channel
0.09 M N Dennis Chavez · County 001, New Mexico · Built 1978 · 2 Lanes · 590 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.025783, -106.722967
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 48 years old.
Nearby Bridges
NM-500 over Amole Channel
Built 1999
Unser Blvd NB over Amole Channel
Built 2016
Blake SW over Amole Del Norte Channel
Built 1990
Blake Road SW over Amole Channel
Built 2007
Gibson Blvd over Amole Channel
Built 2016
98th Street N/S over Amole Channel
Built 2007
Del Rey Road over Unnamed waterway
Built 2003
Arenal SW over Amole Del Norte Channel
Built 1990
Sage SW over Amole Del Norte Channel
Built 1990
NM-500 WBL over RIO GRANDE
Built 1985
Bridge Details
- Structure #
- 000000000009134
- Year Built
- 1978
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 590
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.