FR-2003 over Well-Geothermal Drive
0.9 M N Jct I-10 & I-25 · County 013, New Mexico · Built 2001 · 2 Lanes · 7,517 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.279842, -106.735947
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 25 years old.
Nearby Bridges
I-25 NBL/SBL over Wells-Geothermal Drive
Built 2001
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1968
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1968
13-Z003 over UNNAMED WWAY I25 MP142.7
Built 1968
I-25 NBL over Cholla Road
Built 1968
I-25 SBL over Cholla Road
Built 1968
I-10 WBL over Tortugas Arroyo
Built 1972
I-10 EBL over Tortugas Arroyo
Built 1972
FR-1035 over TORTUGAS ARROYO
Built 1972
I-10 WBL over Cholla Road
Built 1968
Bridge Details
- Structure #
- 000000000009105
- Year Built
- 2001
- Length
- 32.3 m (106 ft)
- Max Span
- 31.1 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 7,517
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.