US-84/285/SFCR 84J over RIO NAMBE
US 84/285 & NM 503 JCT. · County 049, New Mexico · Built 2001 · 9 Lanes · 23,367 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.8967, -106.021375
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 25 years old.
Nearby Bridges
US-84/285 over CR 84
Built 1998
IRR/US-84/285 over NM-502
Built 1998
IRR/NM 502 over TESUQUE RIVER
Built 1987
NM-503 over WOOLEYS ARROYO
Built 1995
IRR/US-84/285 over UNNAMED WATERWAY
Built 1930
IRR/NM-502 over ARROYO JACONA
Built 1947
IRR/NM-502 over Unnamed waterway
Built 1947
49-089A over TESUQUE RIVER
Built 1974
49001 over US 84/285
Built 2014
NM-502 over Unnamed Waterway
Built 2011
Bridge Details
- Structure #
- 000000000008997
- Year Built
- 2001
- Length
- 53.5 m (175.5 ft)
- Max Span
- 17.6 m
- Width
- 53 m (173.9 ft)
- Lanes
- 9
- Daily Traffic
- 23,367
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.