NM-30 over NM-502
JUNCTION NM-30 AND NM-502 · County 049, New Mexico · Built 1998 · 2 Lanes · 8,929 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.884253, -106.154764
This bridge is in worse condition than 48.6% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 28 years old.
Nearby Bridges
IRR/NM-30 over GARCIA ARROYO
Built 1973
NM-502 / IRR over RIO GRANDE
Built 1988
IRR/NM-502 over GUAJE ARROYO
Built 1992
IRR/NM-30 over UNNAMED WATERWAY
Built 1973
IRR/NM-30 over UNNAMED WATERWAY
Built 1973
NM-30 over UNNAMED WATERWAY
Built 1968
IRR BIA RTE 402 over DON JUAN RIVER
Built 1977
IRR/NM-30 over UNNAMED WATERWAY
Built 1973
IRR BIA RT 403 over RIO POJOAQUE
Built 1999
NM-502 over NM-4
Built 1988
Bridge Details
- Structure #
- 000000000008985
- Year Built
- 1998
- Length
- 39 m (128 ft)
- Max Span
- 37 m
- Width
- 19 m (62.3 ft)
- Lanes
- 2
- Daily Traffic
- 8,929
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.