FR-4060 over I-40 EBL/WBL
21.7 M E Jct I-25/I-40 · County 001, New Mexico · Built 1992 · 2 Lanes · 420 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.100025, -106.281953
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 34 years old.
Nearby Bridges
NM-217 over I-40 EBL and WBL
Built 2005
I-40 WBL over NM 333
Built 1976
I-40 EBL over NM-333
Built 1976
I-40 EBL/SBL over SEDILLO CANYON
Built 1948
I-40 WBL over Sedillo Hill Road
Built 1976
I-40 EBL over Sedillo Hill Road
Built 1976
NM-333 over TABLAZON CANYON
Built 1948
I-40 EBL/WBL over TIJERAS ARROYO
Built 1976
NM-333 over JUAN THOMAS CANYON
Built 1935
FR 4058 over TIJERAS ARROYO
Built 1976
Bridge Details
- Structure #
- 000000000008837
- Year Built
- 1992
- Length
- 69.5 m (228 ft)
- Max Span
- 43.3 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 420
- Material
- Steel Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.