31-0030 over PERETTI CANYON
1.6 M SE AZTEC/BASILIO DR · County 031, New Mexico · Built 1987 · 1 Lanes · 338 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.506133, -108.672539
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
31-0030 over PERETTI CANYON
Built 1987
31-101 over Paritti Canyon Wash
Built 2011
I-40 EBL over NM118 BNSF RR Rio Puerco
Built 1980
I-40 WBL over NM118 BNSF RR Rio Puerco
Built 1980
FL-5401 over PARITTI CANYON WASH
Built 1970
I-40 EBL over COUNTY ROAD
Built 1978
I-40 WBL over COUNTY ROAD
Built 1978
I-40 EBL/WBL over LOCAL RD TO REHOBETH
Built 1965
31-Z043 over RIO PUERCO
Built 1972
FL-4430 over PARITTI WASH
Built 1979
Bridge Details
- Structure #
- 000000000008786
- Year Built
- 1987
- Length
- 20 m (65.6 ft)
- Max Span
- 9.1 m
- Width
- 4.4 m (14.4 ft)
- Lanes
- 1
- Daily Traffic
- 338
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $38,000
- Total Project Cost
- $57,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.