FL-5089 over NM-423/Paseo Del Norte
2.53 M W Jct NM423/I-25 · County 001, New Mexico · Built 1987 · 4 Lanes · 7,793 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.179167, -106.627472
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
NM-423 WB over NM-47/SECOND STREET
Built 1995
NM-423 East Bound over NM-47/SECOND STREET
Built 1995
NM-423 over BNSF RAILROAD
Built 1988
NM-423 over EDITH BLVD
Built 1988
Rio Grande Blvd NW over NM-423/Paseo Del Norte
Built 1987
NM-528 over EDITH BLVD N.E.
Built 1987
NM-423 over NORTH DIVERSION CHANNEL
Built 1988
NM-528 EBL over NORTH DIVERSION CHANNEL
Built 1967
NM-528 WB over NORTH DIVERSION CHANNEL
Built 1987
NM-423 over RIO GRANDE
Built 1987
Bridge Details
- Structure #
- 000000000008688
- Year Built
- 1987
- Length
- 35.4 m (116.1 ft)
- Max Span
- 34.1 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 7,793
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.