NM-309 over RIO GRANDE
2.5 MI E OF MAIN ST/BELEN · County 061, New Mexico · Built 1987 · 4 Lanes · 14,859 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.652833, -106.738539
This bridge is in worse condition than 68.8% of bridges in County 061. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
NM-309 over BNSF Railroad
Built 2004
Aragon Road 61101 over BNSF RR
Built 2013
L00013/Main St. over BNSF Railroad
Built 2017
L-00013 over I-25 NB and SB
Built 1970
FL-4224 over Belen Highline Canal
Built 1996
Delgado Street over Belen Highline Canal
Built 1970
I-25 NBL/SBL over BELEN HIGHLINE CANAL
Built 1970
61-4023 over Irrigation Ditch
Built 1970
Aragon Road over Belen Highline Canal
Built 1995
I-25 NBL over NM-548 Camino Del Llano
Built 1970
Bridge Details
- Structure #
- 000000000008683
- Year Built
- 1987
- Length
- 183.8 m (603 ft)
- Max Span
- 22.9 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 4
- Daily Traffic
- 14,859
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.