Seagull Street over Bear Canyon Arroyo

0.2 Mi S of Academy Blvd · County 001, New Mexico · Built 1984 · 2 Lanes · 328 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008657
Year Built
1984
Length
15.2 m (49.9 ft)
Max Span
5.2 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
328
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.