NM-225 over RIO GRANDE
1.2 MI E OF JCT NM-28 · County 013, New Mexico · Built 1990 · 2 Lanes · 4,836 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.999383, -106.635425
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 36 years old.
Nearby Bridges
FM 1905 over TRES SANTOS LATERAL
Built 1956
13-A443 over LA UNION WEST LATERAL
Built 1979
FM 1905 over EAST RIVER DRAIN
Built 1956
NM-478 over ANTHONY ARROYO
Built 1955
NM-186 over RIO GRANDE
Built 1957
SH 20 over DRAIN
Built 1934
NM-186 over LA UNION MAIN CANAL
Built 2017
SH 20 over DRAIN
Built 1934
13-A045 over LA UNION WEST LATERAL
Built 1961
SP 6 EB over ARROYO J.V.
Built 2003
Bridge Details
- Structure #
- 000000000008639
- Year Built
- 1990
- Length
- 114.9 m (377 ft)
- Max Span
- 22.9 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,836
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.