FL-4052 Osuna WB over North Diversion Channel
1.1 Mi W of I-25/Albuq · County 001, New Mexico · Built 1989 · 3 Lanes · 24,282 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.15365, -106.60505
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 37 years old.
Nearby Bridges
FL-4052( Osuna) EB over North Diversion Channel
Built 1966
Singer Blvd.WB over North Diversion Channal
Built 2015
El Pueblo Rd. over North Diversion Channel
Built 1965
FL-6608 East Bound over North Diversion Channel
Built 1986
FL-5037 over Bear Canyon Arroyo
Built 1971
FL-5037 over Bear Canyon Arroyo
Built 1971
I-25 SBL over San Mateo Blvd FL5096
Built 1992
FR-2523 over BEAR CANYON ARROYO
Built 1955
I-25 NBL Off Ramp over I-25 NBL On Ramp
Built 2014
FL-5037 over I-25 NBL/SBL
Built 1988
Bridge Details
- Structure #
- 000000000008625
- Year Built
- 1989
- Length
- 31.4 m (103 ft)
- Max Span
- 30.5 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 3
- Daily Traffic
- 24,282
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.