43-Z001 over CHICO ARROYO
20.7 MI. S.of US 550 · County 043, New Mexico · Built 1983 · 2 Lanes · 102 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.6014, -107.030858
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 43 years old.
Bridge Details
- Structure #
- 000000000008567
- Year Built
- 1983
- Length
- 37.2 m (122 ft)
- Max Span
- 15.2 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 102
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.