43-Z001 over JEMEZ RIVER
0.1 MI NW OF JCT NM-4 · County 043, New Mexico · Built 1972 · 1 Lanes · 102 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.771353, -106.691653
This bridge is in worse condition than 85% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 54 years old.
Nearby Bridges
43-Z001 over JEMEZ RIVER
Built 1993
NM-4 over Church Canyon
Built 2016
NM-4 over JEMEZ CREEK
Built 2019
43-OS39 over JEMEZ CREEK
Built 1972
FDR 265 over JEMEZ RIVER
Built 1957
FDR 376 over GILMAN CANYON
Built 1973
FDR 266 over PALIZA CREEK
Built 1999
FDR 10 over PALIZA CREEK
Built 1956
FDR 376 over RIO GUADALUPE
Built 1982
NM-4 over RIO SAN ANTONIO
Built 1966
Bridge Details
- Structure #
- 000000000008566
- Year Built
- 1972
- Length
- 15.4 m (50.5 ft)
- Max Span
- 7.3 m
- Width
- 4.7 m (15.4 ft)
- Lanes
- 1
- Daily Traffic
- 102
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $85,000
- Total Project Cost
- $128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.