NM-209 over PLAZA LARGA CREEK
9.4 MI S OF LOOP-36/TUCUM · County 037, New Mexico · Built 1985 · 2 Lanes · 568 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.036158, -103.737675
This bridge is in worse condition than 39% of bridges in County 037. The average bridge in New Mexico is 0 years old; this one is 41 years old.
Nearby Bridges
NM-209 over UNNAMED WATERWAY
Built 1940
NM-209 over UNNAMED WATERWAY
Built 1940
NM-209 over TEJANO CREEK
Built 2015
37-QRAK over IRRIGATION CANAL
Built 1940
FL-4896 over I-40 EBL/WBL
Built 1980
I-40 EBL over NM-209
Built 1980
FL-5355 over CONCHAS CANAL
Built 1980
I-40 WBL over NM-209
Built 1980
FL-5355 over I-40 EBL and WBL
Built 1980
I-40 EBL over Conchas Canal
Built 1981
Bridge Details
- Structure #
- 000000000008564
- Year Built
- 1985
- Length
- 64 m (210 ft)
- Max Span
- 22.3 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 568
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.