US-550 SBL over Rio Grande River

1.4 M NW JCT I-25/US-550 · County 043, New Mexico · Built 1986 · 2 Lanes · 91,260 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008537
Year Built
1986
Reconstructed
2018
Length
211.5 m (693.9 ft)
Max Span
27.7 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
91,260
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,171,000
Total Project Cost
$1,757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.