33-B028 over RIO LA CASA
2.8 M SW NM-518/CLEVELAND · County 033, New Mexico · Built 1983 · 2 Lanes · 189 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
35.975444, -105.40475
This bridge is in worse condition than 70.9% of bridges in County 033. The average bridge in New Mexico is 0 years old; this one is 43 years old.
Nearby Bridges
33-B028 over RIO LA CASA
Built 1983
33-B028 over RIO LA CASA
Built 1983
33-B028 over RIO DE CASA
Built 1980
33-B017 over MORA RIVER
Built 1986
NM-518 over UNNAMED WATERWAY
Built 1937
33-A027 over MORA RIVER
Built 1993
33-Z000 over MORA RIVER
Built 1990
33-Z000 over MORA RIVER
Built 1990
NM-434 over MORA RIVER
Built 2019
33-Z000 over MORA RIVER
Built 1983
Bridge Details
- Structure #
- 000000000008519
- Year Built
- 1983
- Length
- 8.5 m (27.9 ft)
- Max Span
- 7.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 189
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.