I-25 SBL over San Antonio Avenue
5.1 Mi N Jct I-25/I-40 · County 001, New Mexico · Built 1984 · 4 Lanes · 144,871 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.160347, -106.587178
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 42 years old.
Nearby Bridges
I-25 NBL over San Mateo Blvd. FL 5096
Built 1992
I-25 NBL over San Antonio Avenue
Built 1984
I-25 NBL/SBL/FRTG over NORTH PINO ARROYO
Built 1955
I-25 NBL Off Ramp over I-25 NBL On Ramp
Built 2014
FL-5037 over NORTH PINO ARROYO
Built 1983
I-25 SBL over San Mateo Blvd FL5096
Built 1992
FL-4053 over Pino Arroyo
Built 1988
FL-4053 over North Pino Arroyo
Built 1976
FR-2523 over UNNAMED WATERWAY
Built 1955
Ray Street over North Pino Arroyo
Built 2003
Bridge Details
- Structure #
- 000000000008507
- Year Built
- 1984
- Reconstructed
- 1992
- Length
- 34.1 m (111.9 ft)
- Max Span
- 32.9 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 144,871
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $252,000
- Total Project Cost
- $378,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.