47-0C23 over PECOS ARROYO

1.8 MI N OF I-25 FRNTG RD · County 047, New Mexico · Built 1976 · 1 Lanes · 210 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000008224
Year Built
1976
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
5.4 m (17.7 ft)
Lanes
1
Daily Traffic
210
Material
Steel
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$28,000
Total Project Cost
$42,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.