I-40 WBL over I-40 Frontage Rd/NM-333
14.4 Mi E Jct I-25/I-40 · County 001, New Mexico · Built 1977 · 3 Lanes · 49,905 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.080642, -106.396558
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 49 years old.
Nearby Bridges
I-40 EBL over I-40 Frontage Rd/NM-333
Built 1977
01-Z000 over Tijeras Arroyo
Built 1987
01-Z000 over Corral Canyon Arroyo
Built 1987
IA-4175 over NM-337
Built 1977
I-40 EBL over NM-337
Built 1977
NM-337 over TIJERAS CANYON
Built 1968
I-40 WBL over NM-337
Built 1977
IA-4175 over NM-333
Built 1977
FDR 423 over CEDRO CREEK
Built 1971
I-40 EBL over NM-14
Built 1977
Bridge Details
- Structure #
- 000000000007602
- Year Built
- 1977
- Reconstructed
- 2007
- Length
- 43.6 m (143 ft)
- Max Span
- 16.8 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 3
- Daily Traffic
- 49,905
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.