NM-47 over ABO ARROYO

2.1 MI N US-60/NM-47 · County 053, New Mexico · Built 1974 · 2 Lanes · 1,260 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 5 Fair

Location

34.459094, -106.549539

This bridge is in worse condition than 79.4% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 52 years old.

Nearby Bridges

Bridge Details

Structure #
000000000007476
Year Built
1974
Length
53.9 m (176.8 ft)
Max Span
11.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,260
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.