NM-47 over ABO ARROYO
2.1 MI N US-60/NM-47 · County 053, New Mexico · Built 1974 · 2 Lanes · 1,260 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
34.459094, -106.549539
This bridge is in worse condition than 79.4% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 52 years old.
Nearby Bridges
Bridge Details
- Structure #
- 000000000007476
- Year Built
- 1974
- Length
- 53.9 m (176.8 ft)
- Max Span
- 11.6 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 1,260
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $350,000
- Total Project Cost
- $525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.