FL-4018 over Julie Channel
0.3M E Jct Louisiana Blvd · County 001, New Mexico · Built 1964 · 8 Lanes · 35,748 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.130664, -106.562242
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 62 years old.
Nearby Bridges
FL-5121 over NORTH HAHN ARROYO
Built 1965
Arroyo Del Oso over Bear Tributary Arroyo
Built 2003
Louisiana Blvd NE over Hahn Arroyo
Built 1967
FL-4057 over North Hahn Arroyo
Built 1967
Spain Road NE over Bear Trib Arroyo
Built 1995
FL-5061 over Hahn Arroyo
Built 1964
FL-4061 over BEAR CANYON ARROYO
Built 1978
California St. NE over North Hahn Arroyo
Built 1991
FL-4053 over Hahn Arroyo
Built 1964
Alvarado Street NE over North Hahn Arroyo
Built 1991
Bridge Details
- Structure #
- 000000000007337
- Year Built
- 1964
- Length
- 12.2 m (40 ft)
- Max Span
- 5.8 m
- Width
- 29.2 m (95.8 ft)
- Lanes
- 8
- Daily Traffic
- 35,748
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $187,000
- Total Project Cost
- $281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.