I-25 NBL over WALDO EXIT FR2097
2.6 M N JCT I-25/ NM-16 · County 049, New Mexico · Built 1972 · 2 Lanes · 39,978 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
35.521092, -106.180178
This bridge is in worse condition than 83.1% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 54 years old.
Nearby Bridges
I-25 SBL over WALDO EXIT FR2097
Built 1972
Ranch Road over NMRX
Built 2009
Straight Street over NMRX
Built 2009
FR-2097 over NMRX
Built 2009
I-25 NBL over NMRX
Built 2009
FR-2090 over I-25 NB - SB & NMRX
Built 1972
NM-16 over I-25 NBL and SBL
Built 1984
I-25 SBL over BONANZA CREEK
Built 1972
I-25 NBL over BONANZA CREEK
Built 1953
FR-2097 over BONANZA CREEK
Built 1990
Bridge Details
- Structure #
- 000000000007175
- Year Built
- 1972
- Reconstructed
- 2003
- Length
- 43.9 m (144 ft)
- Max Span
- 16.8 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 39,978
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.