I-25 NBL over Aragon Road(FR-4228)
2.8 Mi N of S Belen Inchg · County 061, New Mexico · Built 1970 · 2 Lanes · 15,903 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.670144, -106.795933
This bridge is in worse condition than 41.7% of bridges in County 061. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Nearby Bridges
I-25 SBL over Aragon Road
Built 1970
Aragon Road over Belen Highline Canal
Built 1995
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1970
Delgado Street over Belen Highline Canal
Built 1970
FL-4224 over Belen Highline Canal
Built 1996
I-25 NBL over NM-548 Camino Del Llano
Built 1970
I-25 SBL over NM-548 Camino Del Llano
Built 1970
L00013/Main St. over BNSF Railroad
Built 2017
Aragon Road 61101 over BNSF RR
Built 2013
NM-309 over BNSF Railroad
Built 2004
Bridge Details
- Structure #
- 000000000007129
- Year Built
- 1970
- Reconstructed
- 1990
- Length
- 41.1 m (134.8 ft)
- Max Span
- 16.5 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 15,903
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.