I-25 SBL over I-25 Business loop
North Belen Interchange · County 061, New Mexico · Built 1970 · 2 Lanes · 13,715 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.711778, -106.790483
This bridge is in worse condition than 41.7% of bridges in County 061. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Nearby Bridges
I-25 NBL over Loop 13/ N Belen Interch
Built 1970
IT-2195 over UNNAMED WATERWAY
Built 1970
IT-2195 over UNNAMED WATERWAY
Built 1970
I-25 SBL over BNSF R/R
Built 1970
I-25 NBL over BNSF R/R
Built 1970
L-00013 over BELEN HIGHLINE CANAL
Built 1970
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1970
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1970
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1969
61-4023 over Irrigation Ditch
Built 1970
Bridge Details
- Structure #
- 000000000007047
- Year Built
- 1970
- Reconstructed
- 1995
- Length
- 67.1 m (220.1 ft)
- Max Span
- 29.9 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 13,715
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $390,000
- Total Project Cost
- $630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.