L-00012 over I-25 NBL and SBL
11.2 M N Jct I-25/ US-380 · County 053, New Mexico · Built 1970 · 2 Lanes · 8,881 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.076522, -106.893261
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Nearby Bridges
FR-2042 over I-25 NB/SB
Built 1970
L-00012 over SOCORRO CANYON
Built 1939
53-Z001 over UNNAMED WATERWAY
Built 1958
I-25 SBL over Otero Avenue
Built 1970
I-25 NBL over Otero Avenue
Built 1970
I-25 SBL over Manzanares Street
Built 1970
I-25 NBL over Manzanares Street
Built 1970
Gravel Road over Low Flow Conveyance
Built 1986
I-25 NBL over Nogal Arroyo
Built 1958
I-25 SBL over Nogal Arroyo
Built 1958
Bridge Details
- Structure #
- 000000000007032
- Year Built
- 1970
- Length
- 91.7 m (300.9 ft)
- Max Span
- 31.7 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 2
- Daily Traffic
- 8,881
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $802,000
- Total Project Cost
- $1,203,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.