FR-2022 over I-25 NBL and I-25 SBL

7.7 Mi N of Jct NM-152 · County 051, New Mexico · Built 1968 · 2 Lanes · 515 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000006843
Year Built
1968
Length
68.6 m (225.1 ft)
Max Span
21.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
515
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.