FL-4018 over North Diversion Channel
0.19 MI E OF I-25/Albuq · County 001, New Mexico · Built 1966 · 3 Lanes · 41,631 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.131364, -106.607189
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
FL-4018 over North Diversion Channel
Built 1966
FL-4018 over I-25 NB/SB
Built 1961
FR-2523 NB over N DIVERSION CHANNEL
Built 1966
FL-5014 SB over Hahn Arroyo
Built 1968
FL-5014 NB over Hahn Arroyo
Built 1968
I-25 NBL over North Diversion Channel
Built 1966
I-25 SBL over North Diversion Channel
Built 1966
FR-2537 SBL over N DIVERSON CHANNEL
Built 1966
FL-5126 over Hahn Arroyo
Built 1988
FL-4018 over R/R spur removed
Built 1973
Bridge Details
- Structure #
- 000000000006796
- Year Built
- 1966
- Length
- 41.8 m (137.1 ft)
- Max Span
- 19.8 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 3
- Daily Traffic
- 41,631
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.