FR-2027 over I-25 NBLS/SBLS
5.2 Mi N Jct I-25/NM-181 · County 051, New Mexico · Built 1967 · 2 Lanes · 94 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
33.293678, -107.286458
This bridge is in worse condition than 80.4% of bridges in County 051. The average bridge in New Mexico is 0 years old; this one is 59 years old.
Nearby Bridges
I-25 NBL/SBL over CEDAR CANYON
Built 1967
I-25 NBL over Alamosa River
Built 1967
I-25 SBL over Alamosa River
Built 1967
NM-181 over CEDAR CANYON
Built 1939
NM-1 over I-25 NBL and SBL
Built 1967
I-25 NBL/SBL over MITCHELL CANYON
Built 1938
I-25 NBL/SBL over ARAGON WASH
Built 1938
I-25 NBL over Local Road
Built 1979
I-25 SBL over Local Road
Built 1979
I-25 SB over NM-181
Built 1967
Bridge Details
- Structure #
- 000000000006792
- Year Built
- 1967
- Length
- 55.8 m (183.1 ft)
- Max Span
- 15.8 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 94
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $200,000
- Total Project Cost
- $300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.